{"id":449397,"date":"2024-10-20T09:02:29","date_gmt":"2024-10-20T09:02:29","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/nationalgrid-shared-constr-esb756-2023\/"},"modified":"2024-10-26T16:54:42","modified_gmt":"2024-10-26T16:54:42","slug":"nationalgrid-shared-constr-esb756-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/national-grid\/nationalgrid-shared-constr-esb756-2023\/","title":{"rendered":"NationalGrid shared constr esb756 2023"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | Preface <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Table of Contents Introduction <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Revision History List of Appendices of ESB-756 <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | ESB-756 Appendix A <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Table of Contents <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1.0 Purpose 2.0 Scope <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3.0 Definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4.0 General 4.1 Permitted Connections 4.2 Access & Contacts <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.3 Design Requirements <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.4 Types of Generators or Other Parallel Sources <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.5 Limitations <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.0 Project Management 5.1 Responsibilities <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.2 Cooperation <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.3 Development of an Interconnection Arrangement <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.4 Compliance 6.0 Service Installation 6.1 Service Equipment <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6.2 Grounding 6.3 Metering 7.0 Plant Requirements 7.1 Telemetering <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 7.2 Telecommunictions Steps and Requirements <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 7.3 Power Quality 7.4 Performance\/Design <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 7.5 Plant Protection <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 8.0 Operating 8.1 Manual Disconnect Switch 8.2 Disconnection by the Compnay (Isolation) <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 8.3 Other 9.0 Revision History <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | ESB-756 Appendix B <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Table of Contents <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 1.0 Purpose <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 2.0 Scope <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 3.0 Applicable Codes, Standards, and Guidelines <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 4.0 Definitions 5.0 Interconnection Customer Interface Procedures 5.1 Application Process Overview <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 5.2 Interconnection Process- Non Expedited 5.3 Objectives in the Application Process <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 5.4 Special System Considerations <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 5.5 Interconnection Charges <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 6.0 Potential Issues Related to Interconnection 6.1 General Considerations <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 6.2 Significant EPS Considerations <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 7.0 General Design and Operating Requirements <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 7.1 General Criteria <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 7.2 Service Equipment and Revenue Metering <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 7.3 Transformer <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 7.4 Manual Disconnecting Means <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 7.5 Generator Interrupting Device Requirements <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 7.6 Protection and Protective Equipment Requirements <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | 7.7 Monitoring and Control (M&C) at DER Facility <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | 7.8 Voltage and Frequency Ride Through and Control Requirements <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | 8.0 Testing and Commissioning <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | 9.0 Operating 10.0 Power Quality Monitoring 10.1 Power Quality Compliance Verification <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | 10.2 Power Quality Disturbance and Mitigation 10.3 Transient Overvoltage\/Load Rejection Overvoltage (LROV) 11.0 Facility Audit 12.0 Disconnection by the Company (Isolation) <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | 13.0 Revision History <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | Exhibits Attached Exhibit 1: Company Requirements for DER Systems Not Eligable for the Expedited Process Exhibit 2: Reference Maps of National Grid Upstate NY Secondary Netwrok EPS Areas <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | Exhibit 3: Distribution Secondary Grid and Spot Network Description <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | Exhibit 4 Recommended Guidelines for Residential and Commercial Single-line Diagram Submittals <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | Figure 1: Sample Distributed Generator One-Line Diagram <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | Figure 2: Typical Symbology for Electrical Drawings <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | Exhibit 5: Recommended Guidelines for Functional Sinle-line Diagram Submittals <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | Figure 3: Sample Functional Single-Line Diagram <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | Figure 4: Typical 3V0 Requirements for Local EPS Ground Fault Detection Figure 5: Typical Overhead Single Primary Service Configuration in NY for Large DER Installations <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | Figure 6: Typical Underground Single Primary Service Configuration in NY for Large DER Installations <\/td>\n<\/tr>\n | ||||||
98<\/td>\n | Exhibit 6: Net Metering Compliance Verification Checklist Exhibit 7: Net Metering Compliance Verification Checklist (Simplified Process) <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | ESB-756 Appendix C <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | Table of Contents <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | 1.0 Purpose <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | 2.0 Scope <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | 3.0 Applicable Codes, Standards, and Guidelines <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | 4.0 Definitions <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | 5.0 Interconnection Customer Interface Procedures 5.1 Application Process Overview <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | 5.2 Interconnection Process for DER Not Eligable for the Simplified Process 5.3 Objectives in the Application Process <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | 5.4 Special System Considerations <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | 5.5 Interconnection Charges <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | 6.0 Potential Issues Related to Interconnection 6.1 General Considerations <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | 6.2 Significant EPS Considerations <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | 7.0 General Design and Operating Requirements <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | 7.1 General Criteria <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | 7.2 Service Equipment and Revenue Metering <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | 7.3 Transformer <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | 7.4 Manual Generator Disconnecting Means <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | 7.5 Generator Interrupting Device Requirements <\/td>\n<\/tr>\n | ||||||
130<\/td>\n | 7.6 Protection and Protective Equipment Requirements <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | 7.7 Monitoring and Control (M&C) at DER Facility <\/td>\n<\/tr>\n | ||||||
143<\/td>\n | 7.8 Voltage and Frequency Ride Through and Control Requirements <\/td>\n<\/tr>\n | ||||||
145<\/td>\n | 8.0 Testing and Commissioning <\/td>\n<\/tr>\n | ||||||
146<\/td>\n | 9.0 Operating 10.0 Power Quality Monitoring 10.1 Power Quality Compliance Verification <\/td>\n<\/tr>\n | ||||||
147<\/td>\n | 10.2 Power Quality Disturbance and Mitigation 10.3 Transient Overvoltage\/Load Rejection Overvoltage (LROV) 11.0 Facility Audit 12.0 Disconnection by the Company (Isolation) <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | 13.0 Revision History <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | Exhibits Attached Exhibit 1: Company Requirements for Projects Not Eligable for the Simplified Process <\/td>\n<\/tr>\n | ||||||
150<\/td>\n | Exhibit 2: Reference Maps of National Grid Massachusetts Secondary Network EPS Areas <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | Exhibit 3: Distribution Secondary Grid and Spot Network Description <\/td>\n<\/tr>\n | ||||||
152<\/td>\n | Exhibit 4: Recommended Guidelines for Residential and Commercial Single-line Diagram Submittals <\/td>\n<\/tr>\n | ||||||
153<\/td>\n | Figure 1: Sample Residential Photovoltaic Distributed Generator Installation – Single Phase, Net Metered <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | Figure 2: Sample Distributed Generator One-Line Diagram <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | Figure 3: Typical Symbology for Electrical Drawings <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | Exhibit 5: Recommended Guidelines for Functional Single-line Diagram Submittals <\/td>\n<\/tr>\n | ||||||
157<\/td>\n | Figure 4: Sample Functional Single-Line Diagram <\/td>\n<\/tr>\n | ||||||
158<\/td>\n | Figure 5: Typical 3V0 Requirements for Local EPS Ground Fault Detection <\/td>\n<\/tr>\n | ||||||
159<\/td>\n | Exhibit 6: Typical Overhead Primary Service Configuration in MA for Large DER Installation <\/td>\n<\/tr>\n | ||||||
160<\/td>\n | Exhibit 7: Net Metering Verification Checklist (Simplified Process) <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Electric System Bulletin No. 756 – January 2023: Requirements for Parallel Generation Connected to a National Grid Owned EPS<\/b><\/p>\n |