{"id":449397,"date":"2024-10-20T09:02:29","date_gmt":"2024-10-20T09:02:29","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/nationalgrid-shared-constr-esb756-2023\/"},"modified":"2024-10-26T16:54:42","modified_gmt":"2024-10-26T16:54:42","slug":"nationalgrid-shared-constr-esb756-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/national-grid\/nationalgrid-shared-constr-esb756-2023\/","title":{"rendered":"NationalGrid shared constr esb756 2023"},"content":{"rendered":"

None<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nPreface <\/td>\n<\/tr>\n
3<\/td>\nTable of Contents
Introduction <\/td>\n<\/tr>\n
6<\/td>\nRevision History
List of Appendices of ESB-756 <\/td>\n<\/tr>\n
7<\/td>\nESB-756 Appendix A <\/td>\n<\/tr>\n
8<\/td>\nTable of Contents <\/td>\n<\/tr>\n
9<\/td>\n1.0 Purpose
2.0 Scope <\/td>\n<\/tr>\n
10<\/td>\n3.0 Definitions <\/td>\n<\/tr>\n
11<\/td>\n4.0 General
4.1 Permitted Connections
4.2 Access & Contacts <\/td>\n<\/tr>\n
12<\/td>\n4.3 Design Requirements <\/td>\n<\/tr>\n
16<\/td>\n4.4 Types of Generators or Other Parallel Sources <\/td>\n<\/tr>\n
19<\/td>\n4.5 Limitations <\/td>\n<\/tr>\n
20<\/td>\n5.0 Project Management
5.1 Responsibilities <\/td>\n<\/tr>\n
25<\/td>\n5.2 Cooperation <\/td>\n<\/tr>\n
27<\/td>\n5.3 Development of an Interconnection Arrangement <\/td>\n<\/tr>\n
28<\/td>\n5.4 Compliance
6.0 Service Installation
6.1 Service Equipment <\/td>\n<\/tr>\n
29<\/td>\n6.2 Grounding
6.3 Metering
7.0 Plant Requirements
7.1 Telemetering <\/td>\n<\/tr>\n
31<\/td>\n7.2 Telecommunictions Steps and Requirements <\/td>\n<\/tr>\n
32<\/td>\n7.3 Power Quality
7.4 Performance\/Design <\/td>\n<\/tr>\n
34<\/td>\n7.5 Plant Protection <\/td>\n<\/tr>\n
38<\/td>\n8.0 Operating
8.1 Manual Disconnect Switch
8.2 Disconnection by the Compnay (Isolation) <\/td>\n<\/tr>\n
39<\/td>\n8.3 Other
9.0 Revision History <\/td>\n<\/tr>\n
40<\/td>\nESB-756 Appendix B <\/td>\n<\/tr>\n
41<\/td>\nTable of Contents <\/td>\n<\/tr>\n
43<\/td>\n1.0 Purpose <\/td>\n<\/tr>\n
44<\/td>\n2.0 Scope <\/td>\n<\/tr>\n
45<\/td>\n3.0 Applicable Codes, Standards, and Guidelines <\/td>\n<\/tr>\n
46<\/td>\n4.0 Definitions
5.0 Interconnection Customer Interface Procedures
5.1 Application Process Overview <\/td>\n<\/tr>\n
51<\/td>\n5.2 Interconnection Process- Non Expedited
5.3 Objectives in the Application Process <\/td>\n<\/tr>\n
52<\/td>\n5.4 Special System Considerations <\/td>\n<\/tr>\n
53<\/td>\n5.5 Interconnection Charges <\/td>\n<\/tr>\n
55<\/td>\n6.0 Potential Issues Related to Interconnection
6.1 General Considerations <\/td>\n<\/tr>\n
57<\/td>\n6.2 Significant EPS Considerations <\/td>\n<\/tr>\n
58<\/td>\n7.0 General Design and Operating Requirements <\/td>\n<\/tr>\n
59<\/td>\n7.1 General Criteria <\/td>\n<\/tr>\n
61<\/td>\n7.2 Service Equipment and Revenue Metering <\/td>\n<\/tr>\n
62<\/td>\n7.3 Transformer <\/td>\n<\/tr>\n
64<\/td>\n7.4 Manual Disconnecting Means <\/td>\n<\/tr>\n
66<\/td>\n7.5 Generator Interrupting Device Requirements <\/td>\n<\/tr>\n
67<\/td>\n7.6 Protection and Protective Equipment Requirements <\/td>\n<\/tr>\n
76<\/td>\n7.7 Monitoring and Control (M&C) at DER Facility <\/td>\n<\/tr>\n
81<\/td>\n7.8 Voltage and Frequency Ride Through and Control Requirements <\/td>\n<\/tr>\n
83<\/td>\n8.0 Testing and Commissioning <\/td>\n<\/tr>\n
84<\/td>\n9.0 Operating
10.0 Power Quality Monitoring
10.1 Power Quality Compliance Verification <\/td>\n<\/tr>\n
85<\/td>\n10.2 Power Quality Disturbance and Mitigation
10.3 Transient Overvoltage\/Load Rejection Overvoltage (LROV)
11.0 Facility Audit
12.0 Disconnection by the Company (Isolation) <\/td>\n<\/tr>\n
86<\/td>\n13.0 Revision History <\/td>\n<\/tr>\n
87<\/td>\nExhibits Attached
Exhibit 1: Company Requirements for DER Systems Not Eligable for the Expedited Process
Exhibit 2: Reference Maps of National Grid Upstate NY Secondary Netwrok EPS Areas <\/td>\n<\/tr>\n
89<\/td>\nExhibit 3: Distribution Secondary Grid and Spot Network Description <\/td>\n<\/tr>\n
90<\/td>\nExhibit 4 Recommended Guidelines for Residential and Commercial Single-line Diagram Submittals <\/td>\n<\/tr>\n
91<\/td>\nFigure 1: Sample Distributed Generator One-Line Diagram <\/td>\n<\/tr>\n
92<\/td>\nFigure 2: Typical Symbology for Electrical Drawings <\/td>\n<\/tr>\n
93<\/td>\nExhibit 5: Recommended Guidelines for Functional Sinle-line Diagram Submittals <\/td>\n<\/tr>\n
94<\/td>\nFigure 3: Sample Functional Single-Line Diagram <\/td>\n<\/tr>\n
95<\/td>\nFigure 4: Typical 3V0 Requirements for Local EPS Ground Fault Detection
Figure 5: Typical Overhead Single Primary Service Configuration in NY for Large DER Installations <\/td>\n<\/tr>\n
97<\/td>\nFigure 6: Typical Underground Single Primary Service Configuration in NY for Large DER Installations <\/td>\n<\/tr>\n
98<\/td>\nExhibit 6: Net Metering Compliance Verification Checklist
Exhibit 7: Net Metering Compliance Verification Checklist (Simplified Process) <\/td>\n<\/tr>\n
100<\/td>\nESB-756 Appendix C <\/td>\n<\/tr>\n
101<\/td>\nTable of Contents <\/td>\n<\/tr>\n
103<\/td>\n1.0 Purpose <\/td>\n<\/tr>\n
104<\/td>\n2.0 Scope <\/td>\n<\/tr>\n
105<\/td>\n3.0 Applicable Codes, Standards, and Guidelines <\/td>\n<\/tr>\n
106<\/td>\n4.0 Definitions <\/td>\n<\/tr>\n
107<\/td>\n5.0 Interconnection Customer Interface Procedures
5.1 Application Process Overview <\/td>\n<\/tr>\n
112<\/td>\n5.2 Interconnection Process for DER Not Eligable for the Simplified Process
5.3 Objectives in the Application Process <\/td>\n<\/tr>\n
114<\/td>\n5.4 Special System Considerations <\/td>\n<\/tr>\n
116<\/td>\n5.5 Interconnection Charges <\/td>\n<\/tr>\n
117<\/td>\n6.0 Potential Issues Related to Interconnection
6.1 General Considerations <\/td>\n<\/tr>\n
119<\/td>\n6.2 Significant EPS Considerations <\/td>\n<\/tr>\n
120<\/td>\n7.0 General Design and Operating Requirements <\/td>\n<\/tr>\n
121<\/td>\n7.1 General Criteria <\/td>\n<\/tr>\n
123<\/td>\n7.2 Service Equipment and Revenue Metering <\/td>\n<\/tr>\n
125<\/td>\n7.3 Transformer <\/td>\n<\/tr>\n
127<\/td>\n7.4 Manual Generator Disconnecting Means <\/td>\n<\/tr>\n
129<\/td>\n7.5 Generator Interrupting Device Requirements <\/td>\n<\/tr>\n
130<\/td>\n7.6 Protection and Protective Equipment Requirements <\/td>\n<\/tr>\n
141<\/td>\n7.7 Monitoring and Control (M&C) at DER Facility <\/td>\n<\/tr>\n
143<\/td>\n7.8 Voltage and Frequency Ride Through and Control Requirements <\/td>\n<\/tr>\n
145<\/td>\n8.0 Testing and Commissioning <\/td>\n<\/tr>\n
146<\/td>\n9.0 Operating
10.0 Power Quality Monitoring
10.1 Power Quality Compliance Verification <\/td>\n<\/tr>\n
147<\/td>\n10.2 Power Quality Disturbance and Mitigation
10.3 Transient Overvoltage\/Load Rejection Overvoltage (LROV)
11.0 Facility Audit
12.0 Disconnection by the Company (Isolation) <\/td>\n<\/tr>\n
148<\/td>\n13.0 Revision History <\/td>\n<\/tr>\n
149<\/td>\nExhibits Attached
Exhibit 1: Company Requirements for Projects Not Eligable for the Simplified Process <\/td>\n<\/tr>\n
150<\/td>\nExhibit 2: Reference Maps of National Grid Massachusetts Secondary Network EPS Areas <\/td>\n<\/tr>\n
151<\/td>\nExhibit 3: Distribution Secondary Grid and Spot Network Description <\/td>\n<\/tr>\n
152<\/td>\nExhibit 4: Recommended Guidelines for Residential and Commercial Single-line Diagram Submittals <\/td>\n<\/tr>\n
153<\/td>\nFigure 1: Sample Residential Photovoltaic Distributed Generator Installation – Single Phase, Net Metered <\/td>\n<\/tr>\n
154<\/td>\nFigure 2: Sample Distributed Generator One-Line Diagram <\/td>\n<\/tr>\n
155<\/td>\nFigure 3: Typical Symbology for Electrical Drawings <\/td>\n<\/tr>\n
156<\/td>\nExhibit 5: Recommended Guidelines for Functional Single-line Diagram Submittals <\/td>\n<\/tr>\n
157<\/td>\nFigure 4: Sample Functional Single-Line Diagram <\/td>\n<\/tr>\n
158<\/td>\nFigure 5: Typical 3V0 Requirements for Local EPS Ground Fault Detection <\/td>\n<\/tr>\n
159<\/td>\nExhibit 6: Typical Overhead Primary Service Configuration in MA for Large DER Installation <\/td>\n<\/tr>\n
160<\/td>\nExhibit 7: Net Metering Verification Checklist (Simplified Process) <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Electric System Bulletin No. 756 – January 2023: Requirements for Parallel Generation Connected to a National Grid Owned EPS<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
National Grid<\/b><\/a><\/td>\n2023<\/td>\n160<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":449407,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2863],"product_tag":[],"class_list":{"0":"post-449397","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-national-grid","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/449397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/449407"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=449397"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=449397"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=449397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}