{"id":452518,"date":"2024-10-20T09:25:00","date_gmt":"2024-10-20T09:25:00","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1095-2012-3\/"},"modified":"2024-10-26T17:31:17","modified_gmt":"2024-10-26T17:31:17","slug":"ieee-1095-2012-3","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1095-2012-3\/","title":{"rendered":"IEEE 1095-2012"},"content":{"rendered":"
Revision Standard – Active. The procedures for installation described in this guide apply to all types of synchronous generators and generator\/motors rated 5 MVA and above to be coupled to hydraulic turbines or hydraulic pump\/turbines having vertical shafts.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1095-2012 Front Cover \n <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page \n <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Notice to users \n Laws and regulations \n Copyrights \n Updating of IEEE documents \n Errata \n Patents \n <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants \n <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction \n <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Contents \n <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Important notice \n 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 2. Normative references 3. Tools and facilities 3.1 General 3.2 Erection contractor-supplied tools <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3.3 Manufacturer-supplied tools <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 3.4 Customer-supplied materials, services, and facilities 4. Personnel 5. Generator construction <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.1 General arrangement <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.2 Stator construction <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.3 Rotor construction <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.4 Shaft and coupling 5.5 Thrust bearing <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.6 Guide bearings 5.7 Brakes and jacks <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.8 Field assembly requirements <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6. Preparation of generator and turbine shafts in factory 6.1 Factory preassembly and alignment 6.2 Field alignment 7. Installation precautions 7.1 Position references 7.2 Handling of generator parts <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 7.3 Matching of parts 7.4 Use of plumb lines 7.5 Precautions in welding 7.6 Cleanliness <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7.7 Record keeping 8. Receiving, storing, and unpacking 8.1 Receiving <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 8.2 Storing <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 8.3 Unpacking 9. Erection procedures 9.1 General <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 9.2 Generator shipped completely assembled 9.3 Generator assembled in the field, thrust bearing above the rotor, spring type or self-equalizing type thrust bearing <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 9.4 Generator assembled in the field, thrust bearing above the rotor, adjustable-shoe type thrust bearing <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 9.5 Generator assembled in the field, thrust bearing below the rotor, spring type or self-equalizing thrust bearing <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 9.6 Generator assembled in the field, thrust bearing below the rotor, adjustable-shoe type thrust bearing <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 10. Details of erection procedures 10.1 Placing of foundation bolts <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 10.2 Positioning and grouting of soleplates 10.3 Assembly of stator <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 10.4 Assembly of rotor <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 10.5 Assembly of thrust bearing 10.6 Assembly of guide bearings <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 10.7 Installation of lubrication system 10.8 Checking air gap 10.9 Check of insulation against shaft currents <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 10.10 Closing of generator-turbine coupling 10.11 Shaft-plumb and straightness check 10.12 Equalizing the load on adjustable-shoe type bearings <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 10.13 Check of shaft runout 10.14 Assembly of collector rings and brush rigging 10.15 Assembly of rotating dc or brushless exciters <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 10.16 Installation of instruments and relays 11. Mechanical run 11.1 General 11.2 Preparation for initial start <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 11.3 Initial start 11.4 Check of shaft runout <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 12. Balancing 13. Insulation testing and drying out 13.1 Measurement of winding insulation resistance <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 13.2 Drying out of windings 13.3 High-potential tests <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 14. Initial operation 14.1 No-load operation with excitation 14.2 Connection to power system 14.3 Load rejection tests <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 14.4 Operation check of vibration and shaft runout 15. Field tests 15.1 Vertical hydraulic-turbine generator shaft runout tolerances, installation check <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 15.2 Electrical tests <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Annex A (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for the Installation of Vertical Generators and Generator\/Motors for Hydroelectric Applications<\/b><\/p>\n |