{"id":79378,"date":"2024-10-17T18:33:51","date_gmt":"2024-10-17T18:33:51","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-853-1984\/"},"modified":"2024-10-24T19:39:56","modified_gmt":"2024-10-24T19:39:56","slug":"ieee-853-1984","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-853-1984\/","title":{"rendered":"IEEE 853 1984"},"content":{"rendered":"
New IEEE Standard – Inactive – Withdrawn. Withdrawn Standard. Withdrawn Date: Jun 14, 1994. The scope of this recommended practice covers the application of center grounded applied coltage but not voltage wave shapes in which either the positive or negative peak voltage is at ground potential.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
5<\/td>\n | 1 Introduction 1.1 Purpose 1.2 Scope 1.3 Interpretation 1.4 References 1.5 Applicable Document in Preparation <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 2 Testing Equipment 2.1 Center Ground AC Supply 2.2 Wave Shape and Voltage Measurement 2.3 Humidity 3 Specimens 3.1 Specification of Wire 3.2 Concentricity 3.3 Wire Size 3.4 Build 3.5 Formation of Twisted Pair 3.6 Microscopic Examination 4 Procedure 4.1PreliminaryTests 4.2 Selection of Voltage 4.3 Specimen Arrangement <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 4.4Specimen Failure 4.5 Assessment of Uniformity of Discharge 4.6 Examination of Failed Specimens 5 Data Analysis 5.1 Weibull Distribution 5.2 PlotofVoltageVersusTime <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Voltage-Endurance Testing of Enameled Wire<\/b><\/p>\n |