{"id":82246,"date":"2024-10-18T03:03:00","date_gmt":"2024-10-18T03:03:00","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-336-1985\/"},"modified":"2024-10-24T19:49:33","modified_gmt":"2024-10-24T19:49:33","slug":"ieee-336-1985","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-336-1985\/","title":{"rendered":"IEEE 336 1985"},"content":{"rendered":"

Revision Standard – Inactive – Superseded. Superseded by IEEE Std 336-2005 Requirements for installation, inspection, and testing of power, instrumentation, and control equipment and systems during the construction phase of a nuclear facility are set forth. These requirements also cover modifications and those operating phase activities that are comparable in nature and extent to related initial construction activities of the facility. The intent is to establish requirements for safety systems equipment. However, this standard may also be applied to nonsafety systems equipment.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nTitle Page <\/td>\n<\/tr>\n
3<\/td>\nForeword <\/td>\n<\/tr>\n
4<\/td>\nParticipants <\/td>\n<\/tr>\n
6<\/td>\nCONTENTS <\/td>\n<\/tr>\n
7<\/td>\n1. Introduction
1.1 Scope <\/td>\n<\/tr>\n
8<\/td>\n1.2 Applicability
1.3 Responsibility
2. References
3. General Requirements <\/td>\n<\/tr>\n
9<\/td>\n3.1 Prerequisites
3.2 Planning
3.3 Procedures and Instructions <\/td>\n<\/tr>\n
10<\/td>\n3.4 Results
3.5 Measuring and Test Equipment
3.6 Nonconforming Items
3.7 Personnel Qualification
4. Preinstallation Verification <\/td>\n<\/tr>\n
11<\/td>\n5. Installation
5.1 Equipment Placement
5.2 Precautions
6. Verification During Installation
6.1 Inspections <\/td>\n<\/tr>\n
12<\/td>\n6.2 Tests <\/td>\n<\/tr>\n
13<\/td>\n7. Post-Installation Verification
7.1 Inspections
7.2 Tests <\/td>\n<\/tr>\n
14<\/td>\n8. Data Analysis and Evaluation
9. Records
10. Supplementary Provisions for Multiunit Stations and Operating Plants
10.1 Planning and Preparation <\/td>\n<\/tr>\n
15<\/td>\n10.2 Documentation
10.3 Installation <\/td>\n<\/tr>\n
16<\/td>\n10.4 Inspection
10.5 Testing <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Standard Installation, Inspection and Testing Requirements for Power, Instrumentation, and Control Equipment at Nuclear Facilities<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n1985<\/td>\n16<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":82247,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-82246","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/82246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/82247"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=82246"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=82246"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=82246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}