{"id":98629,"date":"2024-10-18T11:54:33","date_gmt":"2024-10-18T11:54:33","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ies-dg-29-2011\/"},"modified":"2024-10-24T21:12:37","modified_gmt":"2024-10-24T21:12:37","slug":"ies-dg-29-2011","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ies\/ies-dg-29-2011\/","title":{"rendered":"IES DG 29 2011"},"content":{"rendered":"

IES DG-29-11, developed by IES in association with the Lighting Controls Association, describes the technical requirements for commissioning lighting and control systems to achieve owner performance criteria in new construction. Retro-commissioning, or application of the Commissioning Process to an existing facility that has not previously been commissioned, is not specifically addressed in this guide, although the same basic process can be applied. The procedures, methods and documentation requirements in this guideline describe the application of lighting and control systems. DG-29-11 should be considered a supplement to ASHRAE Guideline 0-2005 The Commissioning Process. The Guideline was also published by the National Institute of Building Sciences (NIBS) as Guideline 0, the Total Building Commissioning Process. This Design Guide includes requirements for lighting and control systems to fully support the Commissioning Process documentation, verification and acceptance activities during each phase of the Commissioning Process, including a Systems Manual and training for operations and maintenance personnel and occupants. The appropriate application of this guideline will depend upon the owner<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nCover <\/td>\n<\/tr>\n
3<\/td>\nCopyright <\/td>\n<\/tr>\n
6<\/td>\nContents <\/td>\n<\/tr>\n
10<\/td>\n1.0 Introduction
1.1 Benefits
1.2 Commissioning and the Lighting Practitioner <\/td>\n<\/tr>\n
13<\/td>\n1.3 About This Design Guide
2.0 Definitions <\/td>\n<\/tr>\n
14<\/td>\n3.0 Pre-Design Phase
3.1 The Commissioning Team
3.2 The Commissioning Plan <\/td>\n<\/tr>\n
18<\/td>\n3.3 Owner\u2019s Project Requirements (OPR) <\/td>\n<\/tr>\n
19<\/td>\n3.4 Other Pre-Design Phase Activities
4.0 Design Phase <\/td>\n<\/tr>\n
21<\/td>\n4.1. Basis of Design (BOD)
4.2 Project Phasing <\/td>\n<\/tr>\n
25<\/td>\n4.3 Design Criteria
4.4 Other Design Phase Activities
5.0 Construction Phase <\/td>\n<\/tr>\n
27<\/td>\n5.1 Construction Administration and Occupancy
5.2 Performance Testing <\/td>\n<\/tr>\n
29<\/td>\n5.3 Issues Log
5.4 Systems Manual <\/td>\n<\/tr>\n
30<\/td>\n6.0 Occupancy And Operations Phase
6.1 Ongoing Commissioning <\/td>\n<\/tr>\n
31<\/td>\nAnnex A – Example of Basis of Design Related to Lighting and Control
Annex B – Design Criteria for Lighting and Control Systems
B.1 The Space
B.1.1 Volume of the Architectural Space <\/td>\n<\/tr>\n
32<\/td>\nB.1.2 Programming Activities and Illuminance Criteria
B.1.3 Constraints <\/td>\n<\/tr>\n
33<\/td>\nB.2 Lamps and Auxiliary Component Criteria
B.2.1 Lamp Performance
B.3 Maintenance Considerations
B.4 Sustainability
B.5 Luminaire Selection <\/td>\n<\/tr>\n
34<\/td>\nB.6 Additional Considerations
B.7 Specialty Luminaires <\/td>\n<\/tr>\n
35<\/td>\nB.8 Control
B.8.1 Occupancy Sensors
B.8.1.1 Sensor Technology
B.8.1.2 Mounting Guidelines
B.8.1.3 Sensor Sensitivity <\/td>\n<\/tr>\n
36<\/td>\nB.8.1.4 Sensor Integration
B.8.1.5 Measurement and Verification
B.8.1.6 Low-Voltage Relay Schedule Based Time Sweep Control
B.8.2 Daylight Harvesting Control Systems <\/td>\n<\/tr>\n
37<\/td>\nAnnex C – Construction Checklists for Lighting and Control Systems
C.1 Luminaire\/Ballast Verification Checklist
C.2 Lamp Verification Checklist <\/td>\n<\/tr>\n
38<\/td>\nC.3 Controls Verification Checklist
C.4 Luminaire Checklist <\/td>\n<\/tr>\n
39<\/td>\nC.5 Daylighting Design Materials Checklist <\/td>\n<\/tr>\n
40<\/td>\nC.6 Lighting Controls Checklist <\/td>\n<\/tr>\n
41<\/td>\nC.7 Occupancy Sensors <\/td>\n<\/tr>\n
42<\/td>\nC.8 Low-Voltage Relay Schedule-Based Time Sweep Control Systems <\/td>\n<\/tr>\n
43<\/td>\nC.9 Daylight Harvesting Control Systems <\/td>\n<\/tr>\n
44<\/td>\nC.10 Architectural Dimming Control Systems <\/td>\n<\/tr>\n
45<\/td>\nAnnex D – Sample Performance Testing Procedures for Daylighting And Lighting Control Systems
D.1 Making the Building Ready
D.2 Occupancy Sensors <\/td>\n<\/tr>\n
47<\/td>\nD.3 Low-Voltage Relay Schedule-Based Time Sweep Control Systems <\/td>\n<\/tr>\n
48<\/td>\nD.4 Daylight Harvesting Control Systems <\/td>\n<\/tr>\n
49<\/td>\nReferences <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IES DG-29 Design Guide for The Commissioning Process Applied to Lighting and Control Systems<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IES<\/b><\/a><\/td>\n2011<\/td>\n50<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":98630,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2665],"product_tag":[],"class_list":{"0":"post-98629","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ies","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/98629","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/98630"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=98629"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=98629"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=98629"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}