BS EN ISO 11297-1:2018 – TC:2020 Edition
$186.33
Tracked Changes. Plastics piping systems for renovation of underground drainage and sewerage networks under pressure – General
Published By | Publication Date | Number of Pages |
BSI | 2020 | 56 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
30 | National foreword |
32 | European foreword |
35 | Foreword |
36 | Introduction |
39 | 1 Scope 2 Normative references 3 Terms and definitions 3.1 General |
41 | 3.2 Techniques |
43 | 3.3 Characteristics |
45 | 3.4 Materials 3.5 Product stages |
46 | 3.6 Service conditions 4 Symbols and abbreviated terms 4.1 Symbols |
47 | 4.2 Abbreviated terms 5 Pipes at the “M” stage 5.1 Materials 5.2 General characteristics 5.3 Material characteristics 5.4 Geometric characteristics 5.5 Mechanical characteristics |
48 | 5.6 Physical characteristics 5.7 Jointing 5.8 Marking 6 Fittings at the “M” stage 6.1 Materials 6.2 General characteristics 6.3 Material characteristics 6.4 Geometric characteristics |
49 | 6.5 Mechanical characteristics 6.6 Physical characteristics 6.7 Jointing 6.8 Marking 7 Ancillary components 8 Fitness for purpose of the installed lining system at the “I” stage 8.1 Materials |
50 | 8.2 General characteristics 8.3 Material characteristics 8.4 Geometric characteristics 8.5 Mechanical characteristics |
51 | 8.6 Physical characteristics 8.7 Additional characteristics 8.8 Sampling 8.9 Regional requirements for the installed lining system 9 Installation practice 9.1 Preparatory work 9.2 Storage, handling and transport of pipes and fittings 9.3 Equipment 9.3.1 General |
52 | 9.3.2 Inspection equipment 9.3.3 Lifting equipment 9.4 Installation 9.4.1 General 9.4.2 Safety precautions 9.4.3 Simulated installations |
53 | 9.5 Process-related inspection and testing 9.6 Lining termination 9.7 Reconnection to the existing pipeline system 9.8 Final inspection and testing 9.9 Documentation |
54 | Bibliography |