BS ISO 15926-13:2018:2022 Edition

$215.11

Industrial automation systems and integration. Integration of life-cycle data for process plants including oil and gas production facilities – Integrated asset planning life-cycle

Published By Publication Date Number of Pages
BSI 2022 108
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 undefined
7 Foreword
8 Introduction
9 1 Scope
10 2 Normative references
3 Terms, definitions, symbols and abbreviated terms
3.1 Terms and definitions
14 3.2 Abbreviated terms
15 3.3 Symbols
16 4 Layers and extension of integrated asset planning life-cycle data
4.1 Layers for integrated asset planning life-cycle data
17 4.2 The documentation of the layers
18 4.3 Use of the layers
4.4 Extensions for particular engineering applications
4.5 Simplification for a scheduling application view
20 5 Representation of planning data
5.1 Basis of the approach
22 5.2 Fundamental planning objects
5.2.1 Objective of planning
23 5.2.2 Required or proposed activity and specification
25 5.2.3 Alternative specifications
26 5.3 Schedule
5.3.1 Definition of a schedule
27 5.3.2 Level of a schedule
28 5.3.3 Role of a schedule
29 5.4 Planning activity
30 5.5 Actual activity that fulfils a requirement
31 5.6 Decomposition of an activity
5.6.1 Parts of activities and their level
32 5.6.2 Decomposition of a specification
33 5.7 Classifications of an activity
5.7.1 Activity purpose and activity breakdown
5.7.2 Activity management objective
34 5.7.3 Asset life-cycle phase
35 5.7.4 Activity risk
5.7.5 Activity criticality
36 5.7.6 Activity priority
5.7.7 Activity completion status
38 5.7.8 Activity planning status
39 5.8 Resource for an activity
5.8.1 Specification of a resource
42 5.8.2 Resource breakdown
5.8.3 Available physical object for a resource
5.8.4 Quantity-based and time-based resources
43 5.8.5 Consumable material and equipment
5.8.6 Quantity base resource usage
45 5.8.7 Work centre and organizational level
46 5.8.8 Staff time and discipline
47 5.8.9 Consumption profile
48 5.8.10 Material resource availability checking and ordering
49 5.8.11 Material resource delivery
50 5.9 Participants in an activity
5.9.1 Subject of work
52 5.9.2 Subject of work and physical breakdown
53 5.9.3 Role of a person or organization
54 5.9.4 Planning software
5.10 Shutdown
5.10.1 Shutdown phase
5.10.2 Necessary shutdown for an activity
55 5.10.3 Shutdown scope
5.10.4 Shutdown reason
56 5.11 Dates and times for an activity
5.11.1 Beginning and end events for an activity
57 5.11.2 Required beginnings and ends
58 5.11.3 Required as early or as late as possible
59 5.11.4 Proposed beginnings and ends
60 5.11.5 Actual beginnings and ends
5.12 Duration of an activity
62 5.13 Measure of progress
5.13.1 Frontline date
63 5.13.2 Performance measurement
64 5.14 Event and milestone
66 5.15 Temporal relationships between activities and events
5.15.1 Succession relationship
67 5.15.2 Specified lag for a succession relationship
69 5.15.3 Specified lag with calendar for a succession relationship
70 5.15.4 Free float and total float for an activity in plan
71 5.15.5 Dependency relationship
5.16 Calendar
5.16.1 Working days
72 5.16.2 A repeating period in time
74 5.16.3 A repeating point in time
5.17 Identification of objects
75 5.18 Work order
5.19 Area of facility and site
6 Scheduling application view
6.1 Use of the scheduling application view model
76 6.2 Simplification of the ISO 15926 ontology
77 6.3 An actual activity in the scheduling application view model
79 6.4 Data planning for the scheduling application view
87 6.5 User defined properties in the scheduling application view
89 Annex A (normative) Ontology for integrated asset planning life-cycle
93 Annex B (normative) XML schema for exchange between scheduling applications
94 Annex C (informative) Relationship between the planning ontology and the scheduling application interface
96 Annex D (informative) Schedule and activity level
98 Annex E (informative) Interface to reference data libraries
101 Annex F (informative) Usage scenarios
103 Annex G (informative) Relationship with UN/CEFACT XML schema for reporting project schedule and cost performance
104 Bibliography