{"id":112739,"date":"2024-10-18T16:36:20","date_gmt":"2024-10-18T16:36:20","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ashrae-guideline-0-2013\/"},"modified":"2024-10-24T22:05:52","modified_gmt":"2024-10-24T22:05:52","slug":"ashrae-guideline-0-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/ashrae-guideline-0-2013\/","title":{"rendered":"ASHRAE Guideline 0 2013"},"content":{"rendered":"

ASHRAE Guideline 0 presents best practices for applying whole-building commissioning to facilities. The principles and processes included apply to all phases of new construction and renovation projects and provide a uniform, integrated, and consistent approach to commissioning. ASHRAE Guideline 0 includes the Total Building Commissioning Process (TBCxP) as defined by National Institute of Building Sciences (NIBS) in its Commissioning Process Guideline 0. The 2013 edition of the guideline addresses changes to project delivery systems resulting from the evolution of whole-building commissioning in the life cycle and sustainable measurement and verification processes. It emphasizes the role of the owner in clearly documenting the Owner’s Project Requirements so they may be transferred to design criteria and construction documents in a way that provides consistency and continuity throughout the scope of the project. The roles and responsibilities of the owner and Commissioning Authority have been further outlined, and annexes have been updated to assist in further understanding the commissioning process.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nASHRAE Guideline 0-2013 <\/td>\n<\/tr>\n
3<\/td>\nCONTENTS <\/td>\n<\/tr>\n
4<\/td>\nFOREWORD
1. PURPOSE
2. SCOPE <\/td>\n<\/tr>\n
5<\/td>\n3. UTILIZATION
4. DEFINITIONS <\/td>\n<\/tr>\n
6<\/td>\n5. PREDESIGN PHASE <\/td>\n<\/tr>\n
10<\/td>\n6. DESIGN PHASE <\/td>\n<\/tr>\n
14<\/td>\n7. CONSTRUCTION PHASE <\/td>\n<\/tr>\n
18<\/td>\n8. OCCUPANCY\/OPERATIONS PHASE <\/td>\n<\/tr>\n
20<\/td>\n9. REFERENCES <\/td>\n<\/tr>\n
21<\/td>\nNORMATIVE ANNEX A\u2014GUID FOR DEVELOPING SUPPLEMENTARY TECHNICAL GUIDELINES FOR THE COMMISSIONING PROCESS <\/td>\n<\/tr>\n
24<\/td>\nINFORMATIVE ANNEX B\u2014COMMISSIONING PROCESS FLOW CHART <\/td>\n<\/tr>\n
26<\/td>\nINFORMATIVE ANNEX C\u2014COST AND BENEFITS OF THE COMMISSIONING PROCESS <\/td>\n<\/tr>\n
27<\/td>\nINFORMATIVE ANNEX D\u2014COMMISSIONING PROCESS DOCUMENTATION MATRIX <\/td>\n<\/tr>\n
30<\/td>\nINFORMATIVE ANNEX E\u2014COMMISSIONING PROCESS REQUEST FOR QUALIFICATIONS <\/td>\n<\/tr>\n
33<\/td>\nINFORMATIVE ANNEX F\u2014ROLES AND RESPONSIBILITIES <\/td>\n<\/tr>\n
35<\/td>\nINFORMATIVE ANNEX G\u2014COMMISSIONING PLAN <\/td>\n<\/tr>\n
36<\/td>\nINFORMATIVE ANNEX H\u2014ACCEPTANCE PLAN <\/td>\n<\/tr>\n
38<\/td>\nINFORMATIVE ANNEX I\u2014OWNER’S PROJECT REQUIREMENTS WORKSHOP GUIDANCE <\/td>\n<\/tr>\n
40<\/td>\nINFORMATIVE ANNEX J\u2014OWNER’S PROJECT REQUIREMENTS <\/td>\n<\/tr>\n
44<\/td>\nINFORMATIVE ANNEX K\u2014BASIS OF DESIGN (BoD) <\/td>\n<\/tr>\n
45<\/td>\nINFORMATIVE ANNEX L\u2014SPECIFICATIONS <\/td>\n<\/tr>\n
51<\/td>\nINFORMATIVE ANNEX M\u2014CONSTRUCTION CHECKLISTS <\/td>\n<\/tr>\n
56<\/td>\nINFORMATIVE ANNEX N\u2014QUALITY-BASED SAMPLING EXAMPLES <\/td>\n<\/tr>\n
59<\/td>\nINFORMATIVE ANNEX O\u2014SYSTEMS MANUAL <\/td>\n<\/tr>\n
61<\/td>\nINFORMATIVE ANNEX P\u2014TRAINING MANUAL AND TRAINING NEEDS <\/td>\n<\/tr>\n
67<\/td>\nINFORMATIVE ANNEX Q\u2014ADDENDA DESCRIPTION INFORMATION <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASHRAE Guideline 0-2013 The Commissioning Process<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASHRAE<\/b><\/a><\/td>\n2013<\/td>\n72<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":112740,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2719],"product_tag":[],"class_list":{"0":"post-112739","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ashrae","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/112739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/112740"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=112739"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=112739"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=112739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}