{"id":124131,"date":"2024-10-19T04:53:40","date_gmt":"2024-10-19T04:53:40","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/astm-e1699-5\/"},"modified":"2024-10-24T23:09:04","modified_gmt":"2024-10-24T23:09:04","slug":"astm-e1699-5","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/astm\/astm-e1699-5\/","title":{"rendered":"ASTM-E1699"},"content":{"rendered":"
1.1 This practice covers a procedure for defining and satisfying the functions of a project, product, or process (hereafter referred to as focus of study). Projects include construction of commercial and residential buildings and other engineered systems.2<\/sup><\/span> Products include components, systems and equipment.3<\/sup><\/span> Processes include procurement, materials management, work flow, fabrication and assembly, quality control, and services.<\/p>\n<\/div>\n 1.2 A multidisciplinary team uses the procedure to convert stakeholder constraints, needs, and desires into descriptions of functions and then relates these functions to resources.<\/p>\n<\/div>\n 1.3 Examples of costs are all relevant costs over a designated study period, including the costs of obtaining funds, designing, purchasing\/leasing, constructing\/manufacturing\/installing, operating, maintaining, repairing, replacing and disposing of the particular focus of study. While not the only criteria, cost is an important basis for comparison in a VE\/VA study. Therefore, accurate and comprehensive cost data is an important element of the analysis.<\/p>\n<\/div>\n 1.4 This is a procedure to develop alternatives that meet the functions of the focus of study. Estimate the costs for each alternative. Provide the owner\/user\/stakeholder with specific, technically accurate alternatives which can be implemented. The owner\/user\/stakeholder selects the alternative(s) that best satisfies their constraints, needs and desires.<\/p>\n<\/div>\n 1.5 Apply this practice to an entire focus of study, or to any subsystem\/element thereof. The user\/owner\/stakeholder can utilize the VE\/VA procedure to select the element or scope of the study.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":" E1699-14 Standard Practice for Performing Value Engineering (VE)\/Value Analysis (VA) of Projects, Products and Processes (Redline)<\/b><\/p>\n\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n ASTM<\/b><\/a><\/td>\n 2014<\/td>\n 9<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":124132,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2637],"product_tag":[],"class_list":{"0":"post-124131","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-astm","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/124131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/124132"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=124131"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=124131"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=124131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}