{"id":248876,"date":"2024-10-19T16:24:01","date_gmt":"2024-10-19T16:24:01","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-6-2020\/"},"modified":"2024-10-25T11:35:19","modified_gmt":"2024-10-25T11:35:19","slug":"asme-b30-6-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-6-2020\/","title":{"rendered":"ASME B30.6 2020"},"content":{"rendered":"

B30.6 applies to the construction, installation, operation, inspection, testing, and maintenance of guy, stiffleg, basket, breast, gin pole, Chicago boom, shearleg, and A-frame derricks. These derricks, powered by winches through systems of wire rope reeving, are used for lifting, lowering, and horizontal movement of freely suspended unguided loads. Derricks are usually stationary mounted and may be temporarily or permanently installed. The provisions included in this volume also apply to any variations of these types of derricks with the same fundamental characteristics, except those specified for floating derricks in ASME B30.8, Floating Cranes and Floating Derricks.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nCONTENTS <\/td>\n<\/tr>\n
6<\/td>\nFOREWORD <\/td>\n<\/tr>\n
7<\/td>\nASME B30 COMMITTEE ROSTER <\/td>\n<\/tr>\n
9<\/td>\nB30 STANDARD INTRODUCTION <\/td>\n<\/tr>\n
12<\/td>\nASME B30.6-2020 SUMMARY OF CHANGES <\/td>\n<\/tr>\n
14<\/td>\nChapter 6-0 Scope, Definitions, Translations, Personnel Competence, and References
SECTION 6-0.1: SCOPE OF B30.6
SECTION 6-0.2: DEFINITIONS
6-0.2.1 Types of Equipment <\/td>\n<\/tr>\n
15<\/td>\nFigures
Figure 6-0.2.1-1 A-Frame Derrick
Figure 6-0.2.1-2 Basket Derrick <\/td>\n<\/tr>\n
16<\/td>\nFigure 6-0.2.1-3 Breast Derrick
Figure 6-0.2.1-4 Chicago Boom Derrick <\/td>\n<\/tr>\n
17<\/td>\nFigure 6-0.2.1-5 Gin Pole Derrick
Figure 6-0.2.1-6 Guy Derrick <\/td>\n<\/tr>\n
18<\/td>\nFigure 6-0.2.1-7 Shearleg Derrick
Figure 6-0.2.1-8 Stiffleg Derrick <\/td>\n<\/tr>\n
19<\/td>\n6-0.2.2 General <\/td>\n<\/tr>\n
20<\/td>\nSECTION 6-0.3: TECHNICAL AND SAFETY-RELATED INFORMATION
SECTION 6-0.4: PERSONNEL COMPETENCE
SECTION 6-0.5: REFERENCES <\/td>\n<\/tr>\n
21<\/td>\nChapter 6-1 Construction and Installation
SECTION 6-1.1: LOAD RATINGS
6-1.1.1 Basis
6-1.1.2 Rated Load (Working Load) Marking
SECTION 6-1.2: CONSTRUCTION
6-1.2.1 General
6-1.2.2 Guy Derricks
6-1.2.3 Stiffleg Derricks <\/td>\n<\/tr>\n
22<\/td>\n6-1.2.4 Gin Pole Derricks
6-1.2.5 Chicago Boom Derricks
SECTION 6-1.3: ROPES AND REEVING ACCESSORIES
6-1.3.1 General
6-1.3.2 Guy Ropes
6-1.3.3 Boom Hoist Ropes
6-1.3.4 Load Hoist Ropes
6-1.3.5 Reeving Accessories <\/td>\n<\/tr>\n
23<\/td>\n6-1.3.6 Sheaves
SECTION 6-1.4: ANCHORING AND GUYING
6-1.4.1 Guy Derricks
6-1.4.2 Stiffleg Derricks
6-1.4.3 Load-Anchoring Data
SECTION 6-1.5: WINCHES AND SWINGERS
SECTION 6-1.6: GENERAL REQUIREMENTS
6-1.6.1 Guards
6-1.6.2 Lubrication <\/td>\n<\/tr>\n
24<\/td>\n6-1.6.3 Hooks
6-1.6.4 Boom Angle Indicator
6-1.6.5 Controls Marking <\/td>\n<\/tr>\n
25<\/td>\nChapter 6-2 Inspection, Testing, and Maintenance
SECTION 6-2.1: INSPECTION
6-2.1.1 Inspection Classification
6-2.1.2 Frequent Inspection
6-2.1.3 Periodic Inspection
6-2.1.4 Derricks Not in Regular Use <\/td>\n<\/tr>\n
26<\/td>\n6-2.1.5 Inspection Records (for Periodic Inspections)
SECTION 6-2.2: TESTING
6-2.2.1 Operational Tests
6-2.2.2 Load Test
SECTION 6-2.3: MAINTENANCE
6-2.3.1 Preventive Maintenance
6-2.3.2 Maintenance Procedure
6-2.3.3 Adjustments and Repairs <\/td>\n<\/tr>\n
27<\/td>\n6-2.3.4 Lubrication
SECTION 6-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE
6-2.4.1 Inspection <\/td>\n<\/tr>\n
28<\/td>\n6-2.4.2 Rope Maintenance <\/td>\n<\/tr>\n
29<\/td>\nChapter 6-3 Operation
SECTION 6-3.1: QUALIFICATIONS, RESPONSIBILITIES, AND OPERATING PRACTICES
6-3.1.1 Operators
6-3.1.2 Qualifications for Operators <\/td>\n<\/tr>\n
30<\/td>\n6-3.1.3 Lift Planning
SECTION 6-3.2: RESPONSIBILITIES
6-3.2.1 Responsibilities of the Derrick Owner and Derrick User <\/td>\n<\/tr>\n
31<\/td>\n6-3.2.2 Responsibilities of the Site Supervisor and Lift Director
6-3.2.3 Responsibilities of Derrick Operators <\/td>\n<\/tr>\n
32<\/td>\n6-3.2.4 Responsibilities of Riggers <\/td>\n<\/tr>\n
33<\/td>\n6-3.2.5 Responsibilities of Signalpersons
SECTION 6-3.3: HANDLING THE LOAD
6-3.3.1 Size of Load
6-3.3.2 Attaching the Load
6-3.3.3 Moving the Load
6-3.3.4 Personnel Lifting <\/td>\n<\/tr>\n
34<\/td>\n6-3.3.5 Holding the Load
6-3.3.6 Use of Winch Heads
6-3.3.7 Securing Boom
SECTION 6-3.4: SIGNALS
6-3.4.1 Standard Signals
6-3.4.2 Standard Hand Signals
6-3.4.3 Standard Voice Signals
6-3.4.4 Bell or Light Signals <\/td>\n<\/tr>\n
35<\/td>\nFigure 6-3.4.2-1 Standard Hand Signals for Controlling Derricks <\/td>\n<\/tr>\n
37<\/td>\n6-3.4.5 Special Signals
6-3.4.6 Emergency Signals
6-3.4.7 Instructions
SECTION 6-3.5: MISCELLANEOUS
6-3.5.1 Fire Extinguishers
6-3.5.2 Refueling
6-3.5.3 Derrick Operation in the Vicinity of Electric Power Lines <\/td>\n<\/tr>\n
38<\/td>\nFigure 6-3.5.3.1-1 Flowchart to Assist in Determination of Applicable Section of Derrick Operation Near Electric Power Lines <\/td>\n<\/tr>\n
39<\/td>\nFigure 6-3.5.3.1-2 Specified Clearance Around an Electric Power Line
Table
Table 6-3.5.3.1-1 Specified Clearance in the Vicinity of Energized Power Lines <\/td>\n<\/tr>\n
40<\/td>\nFigure 6-3.5.3.1-3 Electric Power Line Support Structures <\/td>\n<\/tr>\n
42<\/td>\n6-3.5.4 Induced Electrical Charges
6-3.5.5 Cab or Operating Enclosure <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASME B30.6-2020: Derricks: Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASME<\/b><\/a><\/td>\n2020<\/td>\n45<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":248880,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2643],"product_tag":[],"class_list":{"0":"post-248876","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asme","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/248876","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/248880"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=248876"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=248876"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=248876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}