{"id":250242,"date":"2024-10-19T16:30:21","date_gmt":"2024-10-19T16:30:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-16-30328492-dc\/"},"modified":"2024-10-25T11:43:36","modified_gmt":"2024-10-25T11:43:36","slug":"bsi-16-30328492-dc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-16-30328492-dc\/","title":{"rendered":"BSI 16\/30328492 DC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
12<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 3 Terms and definitions 3.1 cable management system 3.2 plug and socket-outlet <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3.2.1 socket-outlet 3.2.2 plug 3.3 ship coupler 3.3.1 ship connector 3.3.2 ship inlet <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4 General requirements 4.1 System description <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.2 Distribution system 4.2.1 General 4.2.2 Equipotential bonding <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.3 Compatibility assessment before connection 4.4 LVSC system design and operation 4.4.1 System design 4.4.2 System operation <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.5 Personnel safety 4.6 Design requirements 4.6.1 General 4.6.2 Protection against moisture and condensation 4.6.3 Location and construction <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.6.4 Electrical equipment in hazardous areas 4.7 Electrical requirements 4.8 System study and calculations <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 4.9 Emergency shutdown including emergency-stop facilities <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5 LV shore supply system requirements 5.1 Voltages and frequencies <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.2 Quality of LV shore supply <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6 Shore-side installation 6.1 General 6.2 System component requirements 6.2.1 Circuit-breaker and disconnector <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 6.2.2 Transformer 6.2.3 Neutral earthing resistor 6.2.4 Equipment earthing conductor bonding 6.3 Shore-to-ship electrical protection system <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.4 LV interlocking 6.4.1 General 6.4.2 Operating of the low-voltage (LV) circuit-breakers and disconnectors <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.5 Shore connection convertor equipment 6.5.1 General 6.5.2 Degree of protection 6.5.3 Cooling 6.5.4 Protection <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7 Ship-to-shore connection and interface equipment 7.1 General 7.2 Cable management system 7.2.1 General <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7.2.2 Monitoring of cable tension <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 7.2.3 Monitoring of the cable length 7.3 Plugs and socket-outlets and ship couplers 7.3.1 General <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 7.3.2 Pilot contacts 7.4 Ship-to-shore connection cable <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 7.5 Independent control and monitoring cable 7.6 Storage 8 Ship requirements 8.1 General 8.2 Ship electrical distribution system protection 8.2.1 Short-circuit protection 8.2.2 Earth fault protection, monitoring and alarm 8.3 Shore connection switchboard 8.3.1 General <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 8.3.2 Circuit-breaker and disconnector 8.3.3 Instrumentation and protection 8.4 On-board transformer <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 8.5 On-board receiving switchboard connection point 8.5.1 General 8.5.2 Circuit-breaker 8.5.3 Instrumentation <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 8.5.4 Protection <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 8.5.5 Operation of the circuit-breaker 8.6 Ship power restoration 9 LVSC system control and monitoring 9.1 General requirements <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 9.2 Load transfer via blackout 9.3 Load transfer via automatic synchronization 9.3.1 General 9.3.2 Protection requirements <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 10 Verification and testing 10.1 General 10.2 Initial tests of shore-side installation 10.2.1 General 10.2.2 Tests 10.3 Initial tests of ship-side installation 10.3.1 General <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 10.3.2 Tests 10.4 Tests at the first call at a shore supply point 10.4.1 General 10.4.2 Tests <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 11 Periodic tests and maintenance 11.1 General 11.2 Tests at repeated calls of a shore supply point 11.2.1 General 11.2.2 Verification 12 Documentation 12.1 General 12.2 System description <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex A (Informative) Ship-to-shore connection cable1F A.1 Rated voltage A.2 Rated cross section \/ type A.3 General design A.3.1 General A.3.2 Conductors <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | A.3.3 Earth conductors A.3.4 Pilot elements <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Annex B (normative) Additional requirements for Offshore Supply, Service and Working Ships B.1 Scope B.4.1 System description <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | B.4.3\u2003Compatibility assessment before connection m) sufficient cable length to reach the receiving point level plus 3 meters. B.7.2.1\u2003General B.7.3.1\u2003General <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Annex C (normative) Additional requirements for Container Ships C.1 Scope C.4.1 System description <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | C.4.3\u2003Compatibility assessment before connection m) sufficient cable length to reach the supply point level plus 3 meters. C.7.2.1\u2003General C.7.3.1\u2003General <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex D (informative) Additional requirements for Tankers D.1 Scope D.4.1 System description D.4.3\u2003Compatibility assessment before connection m) sufficient cable length to reach the receiving point level plus 3 meters. <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | D.4.9\u2003 Emergency shutdown including emergency-stop facilities D.5.1\u2003 Voltages and frequencies D.6.2.3\u2003Neutral earthing resistor D.7.2.1\u2003General D.7.3.1\u2003General <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex E (normative) General operating procedures <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Annex F Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BS IEC 80005-3. Utility connections in port. Part 3. Low Voltage Shore Connection (LVSC) Systems. General requirements<\/b><\/p>\n |