{"id":250386,"date":"2024-10-19T16:31:02","date_gmt":"2024-10-19T16:31:02","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-631072020\/"},"modified":"2024-10-25T11:44:30","modified_gmt":"2024-10-25T11:44:30","slug":"bsi-pd-iec-ts-631072020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-631072020\/","title":{"rendered":"BSI PD IEC TS 63107:2020"},"content":{"rendered":"

This document states requirements for integration and testing of IAMS in low-voltage switchgear and controlgear assemblies \u2013 power switchgear and controlgear assemblies according to IEC 61439-1 and IEC 61439-2 (PSC-assemblies) to demonstrate their correct operation.<\/p>\n

This document does not address personnel safety or damage to the PSC-assembly. These requirements are dealt with in IEC TR 61641 (see also 10.10.1).<\/p>\n

\n

NOTE This document can be used as a reference for other types of assemblies in the IEC 61439 series, but adaptation of the test procedures and acceptance criteria can apply taking into account the specifics of such other assemblies or products.<\/p>\n<\/blockquote>\n

IAMS consist of IACDs and IARDs complying with their relevant product standard (e.g. optical based IACDs in accordance with IEC 60947-9-2, AQDs in accordance with IEC 60947-9-1 and SCPD\u2019s in accordance with IEC 60947-2). For the reliable function in a PSC-assembly, the verification of correct operation of the complete system under built-in conditions is addressed.<\/p>\n

This document applies only to enclosed PSC-assemblies and deals with all required verifications needed for the integration in conjunction with IEC 61439-1 and IEC 61439-2.<\/p>\n

The test procedure given in this document takes into consideration:<\/p>\n