{"id":323595,"date":"2024-10-19T22:25:10","date_gmt":"2024-10-19T22:25:10","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-500152014\/"},"modified":"2024-10-25T20:59:32","modified_gmt":"2024-10-25T20:59:32","slug":"bs-iso-500152014","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-500152014\/","title":{"rendered":"BS ISO 50015:2014"},"content":{"rendered":"
This International Standard establishes general principles and guidelines for the process of measurement and verification (M&V) of energy performance of an organization or its components. This International Standard can be used independently, or in conjunction with other standards or protocols, and can be applied to all types of energy.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1\tScope 2\tNormative references 3\tTerms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4\tMeasurement and verification principles 4.1\tGeneral principles 4.2\tAppropriate accuracy and management of uncertainty 4.3\tTransparency and reproducibility of M&V process(es) <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.4\tData management and measurement planning 4.5\tCompetence of the M&V practitioner 4.6\tImpartiality 4.7\tConfidentiality 4.8\tUse of appropriate methods 5\tMeasurement and verification plan 5.1\tGeneral <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.2\tScope and purpose <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.3\tEnergy performance improvement actions 5.4\tM&V boundaries <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.5\tPreliminary M&V plan assessment 5.6\tCharacterization and selection of energy performance metrics including EnPIs <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.7\tCharacterization and selection of relevant variables and static factors 5.8\tSelection of the M&V method and calculation method <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.9\tData\u2013gathering plan <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.10\tEnergy baseline establishment and adjustments <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.11\tResources required 5.12\tRoles and responsibilities 5.13\tDocumentation of the M&V plan 6\tImplementation of M&V plan 6.1\tData\u2013gathering <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.2\tVerification of the implementation of the EPIA(s) 6.3\tObservation anticipated or unforeseen changes 6.4\tM&V analysis <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.5\tM&V reporting 6.6\tReview the need to repeat the process 7\tUncertainty <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 8\tMeasurement and verification documentation <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Annex\u00a0A \n(informative)<\/p>\n Overview of the measurement and verification flow <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Annex\u00a0B \n(informative)<\/p>\n Measurement uncertainty examples <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Energy management systems. Measurement and verification of energy performance of organizations. General principles and guidance<\/b><\/p>\n |