{"id":359060,"date":"2024-10-20T01:24:18","date_gmt":"2024-10-20T01:24:18","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pas-1192-22013\/"},"modified":"2024-10-26T02:03:29","modified_gmt":"2024-10-26T02:03:29","slug":"bsi-pas-1192-22013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pas-1192-22013\/","title":{"rendered":"BSI PAS 1192-2:2013"},"content":{"rendered":"

This Publically Available Specification (PAS) specifies requirements for achieving building information modelling (BIM) Level 2 \u2013 see Figure 1 and Table 1. The requirements within this PAS build on the existing code of practice for the collaborative production of architectural, engineering and construction information, defined within BS 1192:2007.<\/p>\n

PAS 1192\u20112 focuses specifically on project delivery, where the majority of graphical data, non-graphical data and documents, known collectively as the project information model (PIM), are accumulated from design and construction activities.<\/p>\n

The intended audience for this PAS includes organizations and individuals responsible for the procurement, design, construction, delivery, operation and maintenance of buildings and infrastructure assets. Where possible, generic language has been used, but where necessary, specific definitions are in Clause 3<\/b>.<\/p>\n

Commencing at the point of assessment (for existing assets) or statement of need (for new assets) and progressively working through the various stages of the information delivery cycle, the requirements within this PAS culminate with the delivery of the as-constructed asset information model (AIM). This is handed over to the employer by the supplier once the PIM has been verified against what has been constructed.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
3<\/td>\nContents <\/td>\n<\/tr>\n
5<\/td>\nForeword <\/td>\n<\/tr>\n
6<\/td>\nIntroduction <\/td>\n<\/tr>\n
13<\/td>\n1 Scope <\/td>\n<\/tr>\n
14<\/td>\n2 Normative references <\/td>\n<\/tr>\n
15<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
19<\/td>\n4 Overview of documents referenced from this specification <\/td>\n<\/tr>\n
21<\/td>\n5 Information delivery \u2013 Assessment and need
5.1 General <\/td>\n<\/tr>\n
22<\/td>\n5.2 Origin of the employer\u2019s information requirements (EIR)
5.3 Contents of the employer\u2019s information requirements (EIR) <\/td>\n<\/tr>\n
24<\/td>\n6 Information delivery \u2013 Procurement
6.1 General <\/td>\n<\/tr>\n
26<\/td>\n6.2 Production of the pre-contract BIM execution plan (BEP)
6.3 Project implementation plan (PIP)
6.4 Supplier BIM assessment form <\/td>\n<\/tr>\n
27<\/td>\n6.5 Supplier information technology (IT) assessment form
6.6 Supplier resource assessment form
6.7 Supply chain capability summary form <\/td>\n<\/tr>\n
28<\/td>\n7 Information delivery \u2013 Post contract-award
7.1 General
7.2 Production of the post contract-award BIM execution plan (BEP) <\/td>\n<\/tr>\n
29<\/td>\n7.3 Production of the master information delivery plan (MIDP)
7.4 Task information delivery plan (TIDP)
7.5 Project delivery team roles, responsibilities and authority <\/td>\n<\/tr>\n
32<\/td>\n7.6 Volumes <\/td>\n<\/tr>\n
35<\/td>\n8 Information delivery \u2013 Mobilization <\/td>\n<\/tr>\n
36<\/td>\n9 Information delivery \u2013 Production
9.1 General <\/td>\n<\/tr>\n
37<\/td>\n9.2 Common data environment (CDE) <\/td>\n<\/tr>\n
41<\/td>\n9.3 File and layer naming conventions
9.4 Spatial co-ordination <\/td>\n<\/tr>\n
44<\/td>\n9.5 Publication of information
9.6 Design for bespoke manufacture
9.7 Using assemblies and library information <\/td>\n<\/tr>\n
45<\/td>\n9.8 Levels of model definition
9.9 Levels of model detail and model information <\/td>\n<\/tr>\n
53<\/td>\n9.10 Classification <\/td>\n<\/tr>\n
54<\/td>\n10 Information Delivery \u2013 Asset information model (AIM maintenance)
10.1 General \u2013 Information delivery \u2013 Asset information model (AIM) maintenance <\/td>\n<\/tr>\n
55<\/td>\n10.2 Handover process between CAPEXand OPEX <\/td>\n<\/tr>\n
56<\/td>\nAnnex A (informative) Terms, definitions and abbreviations for BIM documentation <\/td>\n<\/tr>\n
65<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Specification for information management for the capital\/delivery phase of construction projects using building information modelling<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2013<\/td>\n68<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":359070,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[700,2641],"product_tag":[],"class_list":{"0":"post-359060","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-35-240-67","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/359060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/359070"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=359060"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=359060"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=359060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}