{"id":359529,"date":"2024-10-20T01:26:35","date_gmt":"2024-10-20T01:26:35","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-iec-14763-42018\/"},"modified":"2024-10-26T02:08:46","modified_gmt":"2024-10-26T02:08:46","slug":"bs-iso-iec-14763-42018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-iec-14763-42018\/","title":{"rendered":"BS ISO\/IEC 14763-4:2018"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | INTRODUCTION <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions 3.2 Abbreviated terms 4 Conformance 5 Configuration and limits of performance of E2E link <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 6 Test configuration of E2E link 7 E2E link testing 8 Laboratory testing of E2E link Figure 1 \u2013 Reference planes and configuration of E2E link <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 9 Field testing of E2E link 9.1 Visual inspection 9.2 Requirements of field test equipment 9.3 Field test measurement parameters 10 Test head requirements 10.1 General 10.2 Test head requirements according to the IEC 60603-7 series <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 10.3 Test head requirements of IEC 61076-2-101 10.4 Test head requirements of IEC 61076-2-109 <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Annex A (normative) Additional requirements for test head designs A.1 General A.2 Outline of additional NEXT requirements A.3 Additional test head requirements A.3.1 Category 5 test head requirements <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | A.3.2 Category 6 test head requirements Table A.1 \u2013 Category 5 E2E link test head de-embedded NEXT performance in the range of frequency of 50 MHz \u2264 f < 100 MHz Table A.2 \u2013 Category 6 E2E link test head de-embedded NEXT performance in the range of frequency of 50 MHz \u2264 f < 250 MHz <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Information technology. Implementation and operation of customer premises cabling – Measurement of end-to-end (E2E) links<\/b><\/p>\n |