{"id":410394,"date":"2024-10-20T05:40:13","date_gmt":"2024-10-20T05:40:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-8528-122022\/"},"modified":"2024-10-26T10:26:12","modified_gmt":"2024-10-26T10:26:12","slug":"bs-iso-8528-122022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-8528-122022\/","title":{"rendered":"BS ISO 8528-12:2022"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1 \u200bScope 2 \u200bNormative references <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 3 \u200bTerms and definitions 4 \u200bAdditional regulations and requirements 5 \u200bClassification designation 5.1 \u200bGeneral <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 5.2 \u200bTypical examples of classification 6 \u200bGenerating set design 6.1 \u200bCriteria for determining the required power <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 6.2 \u200bPower determination 6.3 \u200bOperating limit values <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 7 \u200bAdditional requirements 7.1 \u200bCharacteristics of batteries and battery charger for auxiliaries and starter <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 7.2 \u200bCompressed air starter 7.3 \u200bFuel capacity 7.4 \u200bVentilation louvers 7.5 \u200bElectric power supply 7.6 \u200bRobustness against vibrations <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 8 \u200bControlgear and switchgear 8.1 \u200bGeneral 8.2 \u200bProtection, measurement, monitoring and control equipment for the AC generator 8.2.1 \u200bAC generator protection equipment 8.2.2 \u200bAC generator measurement and monitoring equipment 8.3 \u200bEngine measurement and monitoring equipment 8.4 \u200bGenerating set measurement and monitoring equipment 8.5 \u200bRemote signals <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 9 \u200bTest mode 9.1 \u200bTest operation with synchronization to the mains supply 9.1.1 \u200bGeneral 9.1.2 \u200bGradual power application without switching 9.1.3 \u200bGradual power application with switching 9.1.4 \u200bSudden power application with short time parallel operation <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 9.2 \u200bWithout mains synchronization 10 \u200bTesting 10.1 \u200bGeneral 10.2 \u200bInstallation tests <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 10.3 \u200bPeriodic tests 11 \u200bRating plate 12 \u200bRequired documentation 13 \u200bChecklist <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Reciprocating internal combustion engine driven alternating current generating sets – Emergency power supply to safety services<\/b><\/p>\n |