{"id":459962,"date":"2024-10-20T10:06:58","date_gmt":"2024-10-20T10:06:58","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-69632024\/"},"modified":"2024-10-26T18:41:25","modified_gmt":"2024-10-26T18:41:25","slug":"bs-iso-69632024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-69632024\/","title":{"rendered":"BS ISO 6963:2024"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4 Application <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5 Metrological requirements 5.1 General 5.2 Mass flow meter requirements <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.3 MFM measuring system requirements <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.4 Post approval maintenance 5.4.1 Meter zero verification frequency 5.4.2 Zero verification procedure 5.4.3 Meter and ancillary devices verification and\/or calibration frequency 5.4.4 Software upgrade or update 6 System integrity requirements 6.1 General 6.2 Metrological control 6.2.1 Documentation <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.2.2 Type approval and pattern evaluation 6.3 Security features 6.3.1 Equipment security 6.3.2 Software security 6.3.3 Data security 6.3.4 Critical alarm 6.4 Installation and commissioning 6.4.1 Pre-installation and MFM bunker system sealing plan <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.4.2 Installation and re-installation 6.4.3 Commissioning 6.5 Operational security 6.6 Maintenance control 6.6.1 Maintenance control of MFM bunker system 6.6.2 Re-commissioning 7 Meter selection and installation requirements 7.1 General <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7.2 Site survey at terminals 7.3 Meter selection 7.4 Meter installation <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 7.5 Meter commissioning 8 Site acceptance test requirements 9 Metering procedures 9.1 General 9.2 Documentation 9.2.1 General <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 9.2.2 System documentation 9.2.3 Pre-loading documentation 9.2.4 Post-loading documentation 9.3 Additional documentation at the terminal 9.3.1 Meter totalizer log <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 9.3.2 System documents at the terminal 9.4 Pre-loading procedures 9.4.1 Pre-loading conference 9.4.2 System integrity seals document 9.4.3 Meter reading record 9.5 Loading procedures 9.5.1 General <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 9.5.2 Start of loading <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 9.5.3 End of loading 9.6 Post-loading procedures 9.6.1 Meter reading record 9.6.2 Bunker cargo metering ticket 9.6.3 Determination of loaded quantity <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 9.7 Others 9.7.1 MFM measuring system failure 9.7.2 Disputes 10 Bunker cargo quality 10.1 Bunker cargo specifications <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 10.2 Sampling 10.2.1 Location of sampling equipment 10.2.2 Sampling procedure 10.3 Documentation <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex A (informative) Uncertainty budget table <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Annex B (normative) Zero verification procedure <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex C (normative) Metrological and system integrity requirements <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex D (informative) Typical schematic diagram for MFM bunker system (for bunker cargo loading) <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Annex E (informative) Example of letter of protest for bunker cargo loading <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Annex F (informative) Bunker cargo claims procedure for quantity dispute <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Annex G (informative) Example of a bunker cargo sample label <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Annex H (informative) Example of a certificate of quality <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Bunker cargo loading from oil terminal to bunker tanker using Coriolis mass flow meter<\/b><\/p>\n |