{"id":465330,"date":"2024-10-20T10:39:59","date_gmt":"2024-10-20T10:39:59","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-62395-1-2024-3\/"},"modified":"2024-10-26T19:41:05","modified_gmt":"2024-10-26T19:41:05","slug":"ieee-62395-1-2024-3","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-62395-1-2024-3\/","title":{"rendered":"IEEE 62395-1-2024"},"content":{"rendered":"
Revision Standard – Active.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | FRONT COVER <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | INTRODUCTION <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4 General requirements 4.1 General <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.2 Electrically conductive covering 4.3 Electrical circuit protection requirements for branch circuits 4.4 Temperature requirements 4.4.1 General 4.4.2 Stabilized design 4.4.3 Controlled design <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.4.4 Controls and monitoring for fire sprinkler systems and safety showers 5 Testing 5.1 Type tests \u2013 General <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Tables Table\u00a01 \u2013 Trace heater and surface heater types and related attributes <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Table\u00a02 \u2013 Applicable tests for trace heaters, surface heaters, and integral components, by trace heater and surface heater type <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.2 Type tests \u2013 All applications 5.2.1 Dielectric test Table\u00a03 \u2013 Test voltages for the dielectric test <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.2.2 Electrical insulation resistance test 5.2.3 Flammability test <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Figures Figure\u00a01 \u2013 Flammability test <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.2.4 Room temperature impact test <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Figure\u00a02 \u2013 Example of room temperature impact test apparatus <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.2.5 Minimum temperature impact test <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.2.6 Deformation test Figure\u00a03 \u2013 Example of minimum temperature impact test apparatus <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.2.7 Cold bend test Figure\u00a04 \u2013 Cold bend test <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 5.2.8 Water resistance test 5.2.9 Integral components resistance to water test Figure\u00a05 \u2013 Integral components resistance to water test <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 5.2.10 Verification of rated output Table\u00a04 \u2013 Applicable test subclauses for the verification of rated output <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Figure\u00a06 \u2013 Verification of rated output <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 5.2.11 Thermal stability of electrical insulating material 5.2.12 Thermal performance test <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 5.2.13 Maximum sheath temperature <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Figure\u00a07 \u2013 Verification of sheath temperatures utilizing pipe sculpture fixture <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Figure\u00a08 \u2013 Verification of sheath temperatures utilizing plate fixture <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Figure 9 \u2013 Verification of sheath temperatures utilizing plate fixture with serpentined sample <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Figure\u00a010 \u2013 Plate fixture with two samples crossed over <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Figure\u00a011 \u2013 Plate fixture with a single sample crossed over <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 5.2.14 Verification of start-up current 5.2.15 Verification of the electrical resistance of the electrically conductive covering Figure\u00a012 \u2013 Maximum sheath temperature using the product approach <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 5.2.16 Test for heating device \/ heating device set glands – General Table\u00a05 \u2013 Pulling forces for strain relief test <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 5.2.17 Connection Integrity (integral components) Figure\u00a013 \u2013 Gland temperature measurement \u2013 location of thermocouples <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Figure\u00a014 \u2013 Typical splice firm attachment apparatus <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 5.3 Type tests \u2013 Additional tests for outdoor exposed surface heating installations without thermal insulation 5.3.1 Verification of rated output 5.3.2 Determination of maximum sheath temperature 5.3.3 Increased moisture resistance test <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 5.3.4 UV and condensation test 5.3.5 Resistance to cutting test 5.3.6 Abrasion test <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 5.3.7 Tension test 5.3.8 Rail system voltage spike test Figure\u00a015 \u2013 Abrasion test <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 5.3.9 Rail system over-voltage test 5.4 Type tests \u2013 Additional tests and test modifications for embedded heating applications 5.4.1 Verification of rated output 5.4.2 Determination of maximum sheath temperature 5.4.3 Resistance to cutting test 5.4.4 Flammability test 5.5 Type tests \u2013 Additional tests for applications of trace heaters internal to conduit and piping 5.5.1 Verification of rated output 5.5.2 Determination of maximum sheath temperature <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 5.5.3 Increased moisture resistance test 5.5.4 Pull-strength test <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 5.6 Type tests \u2013 Additional requirements for sprinkler systems 5.6.1 Normal and abnormal operation test 5.6.2 Normal operation test with controller <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | Figure\u00a016 \u2013 Sprinkler system temperature control test \u2013 branch line arrangement <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | Figure\u00a017 \u2013 Sprinkler system temperature control test \u2013branch line \u2013 alternative arrangement Figure\u00a018 \u2013 Sprinkler system temperature control test \u2013 supply pipe arrangement <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 5.6.3 Abnormal operation test with controller malfunctioning 5.6.4 Abnormal operation test without controller 5.6.5 Testing for control systems for fire sprinkler systems 5.7 Routine tests 5.7.1 Dielectric test <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 5.7.2 Verification of rated output 6 Marking 6.1 General 6.2 Product markings <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 7 Installation instructions Table\u00a06 \u2013 Product marking <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | Annex A (informative) Determination of test samples for type testing Table\u00a0A.1 \u2013 Determination of test samples <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE\/IEC International Standard – Electrical Resistance Trace Heating Systems for Industrial and Commercial Applications – Part 1: General and testing requirements (Published)<\/b><\/p>\n |