Shopping Cart

No products in the cart.

ASME B31.8S 2004

$98.04

ASME B31.8S Managing System Integrity of Gas Pipelines

Published By Publication Date Number of Pages
ASME 2004 70
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
4 CONTENTS
FIGURES
TABLES
5 NONMANDATORY APPENDICES
6 FOREWORD
7 COMMITTEE ROSTER
9 SUMMARY OF CHANGES
10 1 INTRODUCTION
1.1 Scope
1.2 Purpose and Objectives
1.3 Integrity Management Principles
11 2 INTEGRITY MANAGEMENT PROGRAM OVERVIEW
2.1 General
12 2.2 Integrity Threat Classification
1 Integrity Management Program Elements
13 2 Integrity Management Plan Process Flow Diagram
14 2.3 The Integrity Management Process
2.3.1 Identify Potential Pipeline Impact by Threat
2.3.2 Gathering, Reviewing, and Integrating Data
2.3.3 Risk Assessment
2.3.4 Integrity Assessment
15 2.3.5 Responses to Integrity Assessment, Mitigation Repair and Prevention, and Setting Inspection Intervals
2.3.6 Update, Integrate, and Review Data
2.3.7 Reassess Risk
2.4 Integrity Management Program
2.4.1 Integrity Management Plan
2.4.2 Performance Plan
2.4.3 Communications Plan
16 2.4.4 Management of Change Plan
2.4.5 Quality Control Plan
3 CONSEQUENCES
3.1 General
3.2 Potential Impact Area
17 3.3 Consequence Factors to Consider
4 GATHERING, REVIEWING, AND INTEGRATING DATA
4.1 General
4.2 Data Requirements
3 Potential Impact Area
18 4.2.1 Prescriptive Integrity Management Programs
4.2.2 Performance-Based Integrity Management Programs
4.3 Data Sources
1 Data Elements for Prescriptive Pipeline Integrity Program
19 4.4 Data Collection, Review, and Analysis
4.5 Data Integration
2 Typical Data Sources for Pipeline Integrity Program
20 5 RISK ASSESSMENT
5.1 Introduction
5.2 Definition
5.3 Risk Assessment Objectives
5.4 Developing a Risk Assessment Approach
21 5.5 Risk Assessment Approaches
5.6 Risk Analysis
5.6.1 Risk Analysis for Prescriptive Integrity Management Programs
22 5.6.2 Risk Analysis for Performance-Based Integrity Management Programs
5.7 Characteristics of an Effective Risk Assessment Approach
3 Integrity Assessment Intervals: Time-Dependent Threats, Prescriptive Integrity Management Plan
23 5.8 Risk Estimates Using Assessment Methods
24 5.9 Data Collection for Risk Assessment
5.10 Prioritization for Prescriptive-Based and Performance-Based Integrity Management Programs
25 5.11 Integrity Assessment and Mitigation
5.12 Validation
6 INTEGRITY ASSESSMENT
6.1 General
26 6.2 Pipeline In-Line Inspection
6.2.1 Metal Loss Tools for the Internal and External Corrosion Threat
6.2.2 Crack Detection Tools for the Stress Corrosion Cracking Threat
6.2.3 Metal Loss and Caliper Tools for Third-Party Damage and Mechanical Damage Threat
27 6.2.4 All Other Threats
6.2.5 Special Considerations for the Use of In-Line Inspection Tools
6.2.6 Examination and Evaluation
6.3 Pressure Testing
28 6.3.1 Time-Dependent Threats
6.3.2 Manufacturing and Related Defect Threats
6.3.3 All Other Threats
6.3.4 Examination and Evaluation
6.4 Direct Assessment
6.4.1 External Corrosion Direct Assessment ECDA for the External Corrosion Threat
6.4.2 Internal Corrosion Direct Assessment Process ICDA for the Internal Corrosion Threat
29 6.4.3 All Other Threats
6.5 Other Integrity Assessment Methodologies
7 RESPONSES TO INTEGRITY ASSESSMENTS AND MITIGATION REPAIR AND PREVENTION
7.1 General
7.2 Responses to Pipeline In-Line Inspections
7.2.1 Metal Loss Tools for Internal and External Corrosion
30 4 Acceptable Threat Prevention and Repair Methods
32 7.2.2 Crack Detection Tools for Stress Corrosion Cracking
7.2.3 Metal Loss and Caliper Tools for Third-Party Damage and Mechanical Damage
7.2.4 Limitations to Response Times for Prescriptive-Based Program
4 Timing for Scheduled Responses: Time-Dependent Threats, Prescriptive Integrity Management Plan
33 7.2.5 Extending Response Times for Performance-Based Program
7.3 Responses to Pressure Testing
7.3.1 External and Internal Corrosion Threats
7.3.2 Stress Corrosion Cracking Threat
7.3.3 Manufacturing and Related Defect Threats
7.4 Responses to Direct Assessment Inspections
7.4.1 External Corrosion Direct Assessment ECDA
7.4.2 Internal Corrosion Direct Assessment ICDA
7.5 Repair Methods
34 7.6 Prevention Strategy/Methods
7.7 Prevention Options
8 INTEGRITY MANAGEMENT PLAN
8.1 General
8.2 Updating the Plan
35 8.3 Plan Framework
8.3.1 Gathering, Reviewing, and Integrating Data
8.3.2 Assess Risk
8.3.3 Integrity Assessment
8.3.4 Responses to Integrity Assessment, Mitigation Repair and Prevention, and Intervals
9 PERFORMANCE PLAN
9.1 Introduction
36 9.2 Performance Measures Characteristics
9.2.1 Process or Activity Measures
9.2.2 Operational Measures
5 Example of Integrity Management Plan for Hypothetical Pipeline Segment (Segment Data: Line 1, Segment 3)
37 9.2.3 Direct Integrity Measures
9.3 Performance Measurement Methodology
9.4 Performance Measurement: Intrasystem
6 Example of Integrity Management Plan for Hypothetical Pipeline Segment (Integrity Assessment Plan: Line 1, Segment 3)
7 Example of Integrity Management Plan for Hypothetical Pipeline Segment (Mitigation Plan: Line 1, Segment 3)
38 8 Performance Measures
39 9.5 Performance Measurement: Industry Based
9.6 Performance Improvement
10 COMMUNICATIONS PLAN
10.1 General
9 Performance Metrics
40 10.2 External Communications
10 Overall Performance Measures
41 10.3 Internal Communications
11 MANAGEMENT OF CHANGE PLAN
42 12 QUALITY CONTROL PLAN
12.1 General
12.2 Quality Management Control
13 TERMS, DEFINITIONS, AND ACRONYMS
43 5 Hierarchy of Terminology for Integrity Assessment
45 14 REFERENCES AND STANDARDS
48 A THREAT PROCESS CHARTS AND PRESCRIPTIVE INTEGRITY MANAGEMENT PLANS
A1 EXTERNAL CORROSION THREAT
A1.1 Scope
A1.2 Gathering, Reviewing, and Integrating Data
A1.3 Criteria and Risk Assessment
A1.4 Integrity Assessment
49 A1.5 Responses and Mitigation
50 A1.6 Other Data
A1.7 Assessment Interval
A1.8 Performance Measures
A2 INTERNAL CORROSION THREAT
A2.1 Scope
A2.2 Gathering, Reviewing, and Integrating Data
A2.3 Criteria and Risk Assessment
51 A2.4 Integrity Assessment
A2.5 Responses and Mitigation
52 A2.6 Other Data
A2.7 Assessment Interval
A2.8 Performance Metrics
A3 STRESS CORROSION CRACKING THREAT
A3.1 Scope
A3.2 Gathering, Reviewing, and Integrating Data
A3.3 Criteria and Risk Assessment
54 A3.4 Integrity Assessment
A3.4.1 Bell Hole Examination and Evaluation Method
A3.4.2 Hydrostatic Testing for SCC
A3.5 Other Data
A3.6 Performance Measures
55 A4 MANUFACTURING THREAT PIPE SEAM AND PIPE
A4.1 Scope
A4.2 Gathering, Reviewing, and Integrating Data
56 A4.3 Criteria and Risk Assessment
A4.4 Integrity Assessment
A4.5 Responses and Mitigation
A4.6 Other Data
A4.7 Assessment Interval
A4.8 Performance Measures
A5 CONSTRUCTION THREAT PIPE GIRTH WELD, FABRICATION WELD, WRINKLE BEND OR BUCKLE, STRIPPED THREADS/BROKEN PIPE/COUPLING
A5.1 Scope
A5.2 Gathering, Reviewing, and Integrating Data
57 A5.3 Criteria and Risk Assessment
58 A5.4 Integrity Assessment
A5.5 Responses and Mitigation
A5.6 Other Data
A5.7 Assessment Interval
A5.8 Performance Measures
A6 EQUIPMENT THREAT GASKETS AND O-RINGS, CONTROL/RELIEF, SEAL/PUMP PACKING
A6.1 Scope
A6.2 Gathering, Reviewing, and Integrating Data
A6.3 Criteria and Risk Assessment
A6.4 Integrity Assessment
59 A6.5 Responses and Mitigation
A6.6 Other Data
A6.7 Assessment Interval
A6.8 Performance Measures
60 A7 THIRD-PARTY DAMAGE THREAT THIRD-PARTY INFLICTED DAMAGE IMMEDIATE, VANDALISM, PREVIOUSLY DAMAGED PIPE
A7.1 Scope
A7.2 Gathering, Reviewing, and Integrating Data
61 A7.3 Criteria and Risk Assessment
A7.4 Integrity Assessment
A7.5 Responses and Mitigation
A7.6 Other Data
A7.7 Assessment Interval
A7.8 Performance Measures
A8 INCORRECT OPERATIONS THREAT
A8.1 Scope
A8.2 Gathering, Reviewing, and Integrating Data
A8.3 Criteria and Risk Assessment
A8.4 Integrity Assessment
62 A8.5 Responses and Mitigation
A8.6 Other Data
A8.7 Assessment Interval
63 A8.8 Performance Measures
A9 WEATHER-RELATED AND OUTSIDE FORCE THREAT EARTH MOVEMENT, HEAVY RAINS OR FLOODS, COLD WEATHER, LIGHTNING
A9.1 Scope
A9.2 Gathering, Reviewing, and Integrating Data
A9.3 Criteria and Risk Assessment
A9.4 Integrity Assessment
A9.5 Responses and Mitigation
A9.6 Other Data
A9.7 Assessment Interval
64 A9.8 Performance Measures
65 B DIRECT ASSESSMENT PROCESS
B1 EXTERNAL CORROSION DIRECT ASSESSMENT
B1.1 Pre-Assessment
B1.2 Indirect Examinations
66 B1.3 Direct Examinations
B1.4 Post-Assessment
67 B2 INTERNAL CORROSION DIRECT ASSESSMENT
B2.1 Pre-Assessment
B2.2 Selecting Local Examination Points
68 B2.3 Local Examination
B2.4 Post-Assessment
69 C PREPARATION OF TECHNICAL INQUIRIES
C1 INTRODUCTION
C2 REQUIREMENTS
C3 SUBMITTAL
ASME B31.8S 2004
$98.04