{"id":129176,"date":"2024-10-19T06:24:16","date_gmt":"2024-10-19T06:24:16","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/awwa-c502-2014\/"},"modified":"2024-10-24T23:34:44","modified_gmt":"2024-10-24T23:34:44","slug":"awwa-c502-2014","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/awwa\/awwa-c502-2014\/","title":{"rendered":"AWWA C502 2014"},"content":{"rendered":"
This standard covers post-type, dry-barrel fire hydrants with compression shutoff (opening against or with the pressure) or gate shutoff for use in water supply service in all climates, including those where freezing occurs.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Copyright <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Committee Personnel <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | SECTION 1: GENERAL Sec. 1.1 Scope Sec. 1.2 Purpose Sec. 1.3 Application <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | SECTION 2: REFERENCES <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | SECTION 3: DEFINITIONS <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | SECTION 4: REQUIREMENTS Sec. 4.1 Permeation Sec. 4.2 Data to Be Provided by the Purchaser Sec. 4.3 Data to Be Provided by the Manufacturer <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Sec. 4.4 Materials <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Sec. 4.5 General Design <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Sec. 4.6 Detailed Design <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Sec. 4.7 Hydrant Inlet <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Sec. 4.8 Valves <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Sec. 4.9 Packing Glands and Packing-Gland Bolts Sec. 4.10 Seals <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Sec. 4.11 Bolts and Nuts Sec. 4.12 Workmanship Sec. 4.13 Painting <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | SECTION 5: VERIFICATION Sec. 5.1 Production Testing <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Sec. 5.2 Prototype Testing <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Sec. 5.3 Inspection and Nonconformance SECTION 6: DELIVERY Sec. 6.1 Marking Sec. 6.2 Shipment <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Sec. 6.3 Affidavit of Compliance <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | APPENDIX A – Characteristics of National Standard Fire-Hose Coupling Screw Thread <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" AWWA C502-14 DRY BARREL FIRE HYDRANTS<\/b><\/p>\n |