{"id":303083,"date":"2024-10-19T20:42:51","date_gmt":"2024-10-19T20:42:51","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-212072015-tc\/"},"modified":"2024-10-25T18:14:59","modified_gmt":"2024-10-25T18:14:59","slug":"bs-iso-212072015-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-212072015-tc\/","title":{"rendered":"BS ISO 21207:2015 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
23<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 1\tScope 2\tNormative references 3\tApparatus and reagents <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 4\tEvaluation of the corrosivity of the tests 4.1\tReference test panels <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 4.2\tArrangement of the reference panels during testing 4.3\tDetermination of mass loss after testing 4.4\tSatisfactory performance of test <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5\tTest objects 6\tProcedure 6.1\tTest method A 6.1.1\tTest cycle 6.1.2\tSalt spray testing followed by drying (step a) <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6.1.3\tExposure to corrosive gases followed by drying (step b) 6.1.4\tTest duration 6.2\tTest method B 6.2.1\tTest cycle <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 6.2.2\tSalt spray testing followed by drying (step a or step c) 6.2.3\tExposure to corrosive gases (step b or step d) 6.2.4\tTest duration 7\tEvaluation of results <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 8\tTest report <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Annex\u00a0A (informative) Recommended test periods <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Corrosion tests in artificial atmospheres. Accelerated corrosion tests involving alternate exposure to corrosion-promoting gases, neutral salt-spray and drying<\/b><\/p>\n |