{"id":344323,"date":"2024-10-20T00:10:54","date_gmt":"2024-10-20T00:10:54","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-50131-82019\/"},"modified":"2024-10-25T23:32:38","modified_gmt":"2024-10-25T23:32:38","slug":"bs-en-50131-82019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-50131-82019\/","title":{"rendered":"BS EN 50131-8:2019"},"content":{"rendered":"
This document specifies the requirements for Security Fog Devices as part of an I&HAS. It covers application and performance and also gives the necessary tests and trials to ensure efficiency and reliability of such obscuration devices.<\/p>\n
This document also gives guidance on the criteria for design, installation, operation and maintenance of Security Fog Devices.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1 Scope 2 Normative references 3 Terms, definitions and abbreviations 3.1 Terms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3.2 Abbreviations 4 Environmental requirements 4.1 Environmental classification 4.2 Environmental tests 4.3 Immunity to electromagnetic interferences <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.4 IP\/IK rating 5 Access levels 6 Protection requirements 6.1 General 6.2 Product safety 6.3 EMC 6.4 Non-toxicity <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.5 Pressure vessels requirements 6.6 Labels and warnings 6.7 Energy efficiency <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6.8 Warning signs 7 Functional requirements 7.1 Performance 7.2 Operation during mains failure 7.3 Operation with mains only 7.4 Additional requirement for equipment using radio frequency interconnections 7.5 Tamper 7.6 SFD damage\/neutralisation <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 7.7 Ejection nozzle 7.7.1 Nozzle protection 7.7.2 Nozzle blocked or obstructed 7.8 Fog eject limiter 7.9 Stopping fog generation 7.10 Heater block – temperature 7.11 Heater block – overheating 7.12 Isolation of the SFD 7.13 Fixings 7.14 Visual Indications 7.15 Communication between the SFD and the I&HAS 7.15.1 General <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 7.15.2 Minimum information to be communicated 7.15.3 Non-critical faults 7.15.4 Optional signals 7.16 Fault monitoring 7.17 Power failure 8 Consumables 8.1 General 8.2 Formulation <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 8.3 Traceability 9 Marking 10 Documentation 11 Design, installation, operation and maintenance <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Annex A (normative)Performance tests A.1 General A.2 Fog test chamber A.3 Test procedure <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | A.4 Activation test A.5 Fog output of EUT <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | A.6 Fog persistency A.7 Fog output over test periods A.8 Fog visibility\/density table <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | A.9 Performance data <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Annex B (normative)SFD warning sign B.1 Warning sign requirements <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex C (normative)Measurement procedure for power in idle mode C.1 Test room (EN 50564:2011, 4.2) C.2 Power supply (EN 50564:2011, 4.3) C.3 Measuring instruments (EN 50564:2011, 4.4) C.4 Preparation of unit under test (EN 50564:2011, 5.2) <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | C.5 Test setup C.6 Measurement (EN 50564:2011, 5.3.2) C.7 Reporting <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex D (informative)Guidance on design, installation, operationand maintenance of the SFD D.1 Risk assessment D.2 General notification D.3 Verified alarm triggering D.4 Multi-occupancy D.5 Man trap \u2013 building unoccupied <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | D.6 Hold-up \u2013 Building occupied D.7 Installed SFD test D.8 Training D.9 Manufacturers requirements <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Alarm systems. Intrusion and hold-up systems – Security fog devices<\/b><\/p>\n |