{"id":487974,"date":"2024-11-05T12:18:16","date_gmt":"2024-11-05T12:18:16","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/api-rp-100-2-2015-r2020\/"},"modified":"2024-11-05T12:18:16","modified_gmt":"2024-11-05T12:18:16","slug":"api-rp-100-2-2015-r2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/api\/api-rp-100-2-2015-r2020\/","title":{"rendered":"API RP 100-2-2015 (R2020)"},"content":{"rendered":"

1.1 General This document provides recommended practices applicable to the planning and operation of wells, and hydraulically fractured wells. Topics covered include recommendations for managing environmental aspects during planning; site selection; logistics; mobilization, rig-up, and demobilization; and stimulation operations. Also, this document includes guidance for managing environmental aspects during well construction. This document provides recommendations for the following topics: <\/p>\n