{"id":81005,"date":"2024-10-17T18:50:18","date_gmt":"2024-10-17T18:50:18","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-336-2006\/"},"modified":"2024-10-24T19:45:24","modified_gmt":"2024-10-24T19:45:24","slug":"ieee-336-2006","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-336-2006\/","title":{"rendered":"IEEE 336 2006"},"content":{"rendered":"
Revision Standard – Inactive – Superseded. This guide provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility. This guidance is applicable to initial construction, modification (backfit), and maintenance activities. This guide does not apply to periodic testing.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | IEEE Guide for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Con… <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction Notice to users Errata <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Interpretations Patents Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | IEEE Guide for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 1.3 Applicability 1.4 Responsibility 2. Normative references <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4. General considerations for initial construction, modification, andmaintenance 4.1 General 4.2 Configuration management <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.3 Planning 4.4 Closeout tracking <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.5 Procedures 4.6 Measuring and test equipment 4.7 Personnel qualification 4.8 Test data evaluation <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.9 Results 4.10 Nonconforming items 4.11 Records 5. Pre-installation constructability review <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6. Installation\/Construction 6.1 Equipment placement 6.2 Engineering procedures and specifications 6.3 Verification during installation <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.4 Post-installation inspections <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.5 Inspections of temporary conditions 7. Testing 7.1 General 7.2 Material source testing 7.3 Electrical tests 7.4 Physical and chemical tests <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 7.5 Mechanical tests 7.6 Equipment functional tests 7.7 System tests 7.8 Post-modification\/maintenance testing plan (PMTP) <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 8. Supplementary provisions for multi-unit facilities 8.1 General 8.2 Planning and preparation <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 8.3 Work tagging considerations 8.4 Protection of existing unit(s) Common area restriction <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities<\/b><\/p>\n |